APPLICATION PROCESS
Bullyliner™ Coverage:
*Refer to data sheet below for application.
Note:
Depending on weather conditions, Bullyliner™ standard full curing time is 72hours from application. longer full cure time can be expected in temptures below 10℃. Bullyliner™ cross-linking chemical curing process is accelerated by UV light exposure. Please see Bullyliner™ PDF user manual at bottom of this page.
WHY BULLYLINER IS BETTER?
- Environmentally friendly product
- Water based coating
- Made from recycled tyres
- Self cleaning nano-technology
- Applies to almost any surface
- No mixing required
- No waste
Preperation Guide
STEP 1
All surfaces must be clean, lightly sand to scuff surface. any advanced rust should be treated with Nutech EcoSafe rust converter inhibitor.
STEP 2
After light sanding, wipe down all surfaces with acetone removing all dust to ensure the surface is prepared.
STEP 3
Ensure edge masking tape is placed around all non-coating areas.
STEP 4
Tape masking paper around all surrounding areas to avoid any over spray.
STEP 5
Apply first coat of Bully rubber liner evenly to entire surface.
STEP 6
Once the first coat is touch dry, before re-coating.
STEP 7
Apply 2nd coat of Bully Rubber liner evenly to enter surface.
STEP 8
If any repairs are needed, lightly sand affected area, re-apply Bully Rubber Liner by roller, brush or spray.
Protection &Style
Bullyliner™ can be built up to any thickness simply by applying multiple coats. for commercial use a minimum of 3-4 coats may be required.
Copyright © 2019 Bullyliner™. All rights reserved.