HOW TO APPLY

Bullyliner™ MUST BE TOUCH DRY BETWEEN COATS.

agriculture

APPLICATION PROCESS

Bullyliner™ Coverage:

  • Approximately 6sqm per litre
  • Applied by: Brush, Roller, Spray Gun
  • *Refer to data sheet below for application.

    Note:

  • Minimum 2 coats are recommended for light to moderate abrasion resistance.
  • 3 or more coats are required for commercial use.
  • Bullyliner™ can be built to any thickness by simply applying multiple coats.
  • Depending on weather conditions, Bullyliner™ standard full curing time is 72hours from application. longer full cure time can be expected in temptures below 10℃. Bullyliner™ cross-linking chemical curing process is accelerated by UV light exposure. Please see Bullyliner™ PDF user manual at bottom of this page.

    WHY BULLYLINER IS BETTER?

    • Environmentally friendly product
    • Water based coating
    • Made from recycled tyres
    • Self cleaning nano-technology
    • Applies to almost any surface
    • No mixing required
    • No waste

    Protection &Style

    Bullyliner™ can be built up to any thickness simply by applying multiple coats. for commercial use a minimum of 3-4 coats may be required.

    Download Product Data Sheet

    Download Hints & Tips

    scroll up